CENTERLINE RD over COLE CAMP CR

S 8 T 42 N R 21 W · County 015, Missouri · Built 1902 · 1 Lanes · 80 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Poor
Deck
4
Poor
Superstructure
4
Poor
Substructure
5
Fair

Bridge Details

Structure #
17141
Year Built
1902
Reconstructed
2002
Length
17.7 m (58.1 ft)
Max Span
7.9 m
Width
5.5 m (18 ft)
Lanes
1
Daily Traffic
80
Material
Wood or Timber
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$303,000
Total Project Cost
$455,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.