FERGUSON AVE over MALINE CR
S 393 T 46 N R 6 E · County 189, Missouri · Built 1977 · 3 Lanes · 5,973 vehicles/day
Structurally Deficient
— One or more key components rated 4 (Poor) or below
Overall
Deck
4
Poor
Superstructure
4
Poor
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 4 | Poor |
| Superstructure | 4 | Poor |
| Substructure | 6 | Satisfactory |
Location
38.737272, -90.287886
This bridge is in worse condition than 95.9% of bridges in County 189. The average bridge in Missouri is 0 years old; this one is 49 years old.
Nearby Bridges
BERMUDA DR over MALINE CR
Built 1961
RT N S over BALL CR
Built 1949
W FLORISSANT AVE over MALINE CR
Built 2004
PAUL AVE over TRIB OF MALINE CR
Built 2002
WEST FLORISSANT AV over TRRA RR
Built 1959
FLORISSANT RD over MALINE CR
Built 1997
GLENOWEN DR over MALINE CR
Built 1999
NE LUCAS-HUNT RD over NS RR
Built 1941
SW LUCAS-HUNT RD over NS RR
Built 1973
RP BERMUDA RD TO I over RT N RP RTNS TO IS70W
Built 2001
Bridge Details
- Structure #
- 17115
- Year Built
- 1977
- Length
- 35.1 m (115.2 ft)
- Max Span
- 11.3 m
- Width
- 14 m (45.9 ft)
- Lanes
- 3
- Daily Traffic
- 5,973
- Material
- Prestressed Concrete Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- City or Municipal Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $1,181,000
- Total Project Cost
- $1,771,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.