DUNBAR AVE over HENRIE AVE
S 1 T 52 N R 30 W · County 047, Missouri · Built 1907 · 2 Lanes · 1,700 vehicles/day
Structurally Deficient
— One or more key components rated 4 (Poor) or below
Overall
Deck
4
Poor
Superstructure
4
Poor
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 4 | Poor |
| Superstructure | 4 | Poor |
| Substructure | 5 | Fair |
Location
39.341956, -94.228167
This bridge is in worse condition than 93.7% of bridges in County 047. The average bridge in Missouri is 0 years old; this one is 119 years old.
Nearby Bridges
BROADWAY AVE over DRY FK OF FISHING
Built 1933
SOUTH ST over FK OF FISHING RVR
Built 1986
S THOMPSON AVE over FK OF FISHING RVR
Built 1998
N THOMPSON AVE over FK OF FISHING RVR
Built 1990
N MARIETTA ST over FK OF FISHING RVR
Built 1920
S MARIETTA ST over E FK FISHING RVR
Built 1924
MO 10 E over CST MARIETTA ST FISHING
Built 2015
GARLAND AVE over DRY FK FISHING RVR
Built 1917
MO 10 E over FISHING CR PEDESTRIAN /
Built 2015
NE 143RD TERRACE over BR OF FISHING RVR
Built 1935
Bridge Details
- Structure #
- 16952
- Year Built
- 1907
- Reconstructed
- 1980
- Length
- 11.6 m (38.1 ft)
- Max Span
- 9.4 m
- Width
- 9.1 m (29.9 ft)
- Lanes
- 2
- Daily Traffic
- 1,700
- Material
- Concrete
- Design
- Tee Beam
- Owner
- City or Municipal Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $324,000
- Total Project Cost
- $487,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.