US 61 N over IS 55

S 19 T 17 N R 12 E · County 155, Missouri · Built 1971 · 2 Lanes · 1,250 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Poor
Deck
7
Good
Superstructure
4
Poor
Substructure
6
Satisfactory

Bridge Details

Structure #
1630
Year Built
1971
Reconstructed
1984
Length
83.2 m (273 ft)
Max Span
29 m
Width
14.3 m (46.9 ft)
Lanes
2
Daily Traffic
1,250
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,203,000
Total Project Cost
$1,804,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.