NOVEMBER RD over DAVIS CR
S 16 T 62 N R 38 W · County 087, Missouri · Built 1930 · 1 Lanes · 15 vehicles/day
Structurally Deficient
— One or more key components rated 4 (Poor) or below
Overall
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
4
Poor
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 6 | Satisfactory |
| Substructure | 4 | Poor |
Location
40.181561, -95.181614
This bridge is in worse condition than 85.3% of bridges in County 087. The average bridge in Missouri is 0 years old; this one is 96 years old.
Nearby Bridges
RT HH E over DAVIS CR
Built 1957
US 159 S over KIMSEY CR
Built 1960
NOVEMBER RD over TRIB TO DAVIS CR
Built 2002
LINCOLN RD over TRIB E BR SQUAW CR
Built 2005
COUNTY RD 140 over E BR SQUAW CR
Built 2003
MEMPHIS RD over DAVIS CR
Built 2017
LINCOLN RD over SQUAW CRK
Built 2025
MEMPHIS RD over SQUAW CR
Built 1900
LINCOLN RD over SQUAW CR
Built 1900
RT C W over SQUAW CR
Built 2011
Bridge Details
- Structure #
- 16235
- Year Built
- 1930
- Length
- 12.2 m (40 ft)
- Max Span
- 11.9 m
- Width
- 4.7 m (15.4 ft)
- Lanes
- 1
- Daily Traffic
- 15
- Material
- Steel
- Design
- Girder and Floorbeam System
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $229,000
- Total Project Cost
- $344,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.