SECOND ST over TANYARD BR

S 3 T 39 N R 4 E · County 099, Missouri · Built 1900 · 2 Lanes · 150 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
8
Very Good
Substructure
5
Fair

Bridge Details

Structure #
16223
Year Built
1900
Reconstructed
2008
Length
9.5 m (31.2 ft)
Max Span
8.9 m
Width
10.4 m (34.1 ft)
Lanes
2
Daily Traffic
150
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.