RT PP E over HOLT CR

S 25 T 54 N R 31 W · County 049, Missouri · Built 1964 · 2 Lanes · 4,130 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
160
Year Built
1964
Reconstructed
2000
Length
47.8 m (156.8 ft)
Max Span
18.3 m
Width
9 m (29.5 ft)
Lanes
2
Daily Traffic
4,130
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$827,000
Total Project Cost
$1,240,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.