BASIL AVE over JORDAN CR
S 8 T 49 N R 23 W · County 195, Missouri · Built 1950 · 1 Lanes · 35 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 7 | Good |
| Substructure | 5 | Fair |
Location
39.052539, -93.453142
This bridge is in worse condition than 72.9% of bridges in County 195. The average bridge in Missouri is 0 years old; this one is 76 years old.
Nearby Bridges
185TH RD over JORDAN CR
Built 1996
170TH RD over JORDAN CR
Built 1967
157TH RD over JORDAN CR
Built 2008
MO 127 S over ELMWOOD BR
Built 2010
163RD RD over DAVIS CR
Built 1968
LITER RD over BRUSHY CR
Built 1930
153RD RD over DAVIS CR
Built 1967
150TH RD over JORDAN CR
Built 1973
187TH RD over SALT POND CR
Built 1996
CLOVER RD over SALT POND CR
Built 1981
Bridge Details
- Structure #
- 15983
- Year Built
- 1950
- Length
- 12.2 m (40 ft)
- Max Span
- 11.9 m
- Width
- 5.1 m (16.7 ft)
- Lanes
- 1
- Daily Traffic
- 35
- Material
- Steel
- Design
- Stringer/Multi-beam or Girder
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $156,000
- Total Project Cost
- $234,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.