BARRETT STATION RD over SUGAR CR

S 4 T 44 N R 5 E · County 189, Missouri · Built 1935 · 2 Lanes · 2,615 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
5
Fair

Bridge Details

Structure #
15619
Year Built
1935
Reconstructed
1989
Length
11.3 m (37.1 ft)
Max Span
10.7 m
Width
6.8 m (22.3 ft)
Lanes
2
Daily Traffic
2,615
Material
Prestressed Concrete
Design
Box Beam or Girders - Multiple
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$257,000
Total Project Cost
$385,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.