LUCAS-HUNT RD over MALINE CR

S 8 T 46 N R 7 E · County 189, Missouri · Built 1974 · 4 Lanes · 16,241 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
15560
Year Built
1974
Reconstructed
1999
Length
77.4 m (253.9 ft)
Max Span
28 m
Width
18.6 m (61 ft)
Lanes
4
Daily Traffic
16,241
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$1,965,000
Total Project Cost
$2,948,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.