LUCAS-HUNT RD over MALINE CR
S 8 T 46 N R 7 E · County 189, Missouri · Built 1974 · 4 Lanes · 16,241 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 7 | Good |
| Substructure | 6 | Satisfactory |
Location
38.738719, -90.260778
This bridge is in worse condition than 51.2% of bridges in County 189. The average bridge in Missouri is 0 years old; this one is 52 years old.
Nearby Bridges
GLENOWEN DR over MALINE CR
Built 1999
RT AC S over MALINE CR
Built 1968
NE LUCAS-HUNT RD over NS RR
Built 1941
SW LUCAS-HUNT RD over NS RR
Built 1973
CHAMBERS RD over BLACK JACK CR
Built 1958
GREEN VALLEY DR over DELLWOOD CR
Built 1950
IMPERIAL DR over DELLWOOD CR
Built 1939
W FLORISSANT AVE over MALINE CR
Built 2004
WEST FLORISSANT AV over TRRA RR
Built 1959
RT AC S over BR MALINE CR
Built 1968
Bridge Details
- Structure #
- 15560
- Year Built
- 1974
- Reconstructed
- 1999
- Length
- 77.4 m (253.9 ft)
- Max Span
- 28 m
- Width
- 18.6 m (61 ft)
- Lanes
- 4
- Daily Traffic
- 16,241
- Material
- Steel Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $1,965,000
- Total Project Cost
- $2,948,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.