RT CC E over LIT WAKENDA CR

S 22 T 53 N R 23 W · County 033, Missouri · Built 1966 · 2 Lanes · 236 vehicles/day

Overall
Fair
Deck
9
Excellent
Superstructure
9
Excellent
Substructure
6
Satisfactory

Bridge Details

Structure #
1514
Year Built
1966
Reconstructed
2024
Length
25.9 m (85 ft)
Max Span
8.4 m
Width
8.1 m (26.6 ft)
Lanes
2
Daily Traffic
236
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.