MULE TRAIN WAY over SOUTH FK S FABIUS

S 19 T 63 N R 13 W · County 001, Missouri · Built 1992 · 1 Lanes · 15 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
15133
Year Built
1992
Length
12.5 m (41 ft)
Max Span
12.2 m
Width
4.9 m (16.1 ft)
Lanes
1
Daily Traffic
15
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$156,000
Total Project Cost
$234,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.