MULE TRAIN WAY over SOUTH FK S FABIUS
S 19 T 63 N R 13 W · County 001, Missouri · Built 1992 · 1 Lanes · 15 vehicles/day
Overall
Deck
8
Very Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 8 | Very Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
40.259333, -92.392469
This bridge is in worse condition than 21.3% of bridges in County 001. The average bridge in Missouri is 0 years old; this one is 34 years old.
Nearby Bridges
MO 11 S over S FK S FABIUS RVR
Built 2022
RT J S over S FK FABIUS RVR
Built 1957
CHAPMAN WAY over BRANCH
Built 1997
OAK GROVE WAY over BR OF S FK OF S FA
Built 2007
BIRCH WAY over BR OF S FK OF S FA
Built 2004
GARDEN GROVE WAY over BR OF S FK FABIUS
Built 2007
OLIVE HILL WAY over COTTONWOOD FK
Built 1999
OAK GROVE WAY over SOUTH FORK OF S FA
Built 1999
SABBATH HOME WAY over BR OF N FK SALT RV
Built 2011
CENTURY WAY over TRIB N FK S FABIUS
Built 2007
Bridge Details
- Structure #
- 15133
- Year Built
- 1992
- Length
- 12.5 m (41 ft)
- Max Span
- 12.2 m
- Width
- 4.9 m (16.1 ft)
- Lanes
- 1
- Daily Traffic
- 15
- Material
- Steel
- Design
- Stringer/Multi-beam or Girder
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $156,000
- Total Project Cost
- $234,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.