CITY ST over BROOKS HOLLOW

S 29 T 32 N R 1 E · County 179, Missouri · Built 1935 · 2 Lanes · 75 vehicles/day

Overall
Fair
Culvert
6
Satisfactory

Bridge Details

Structure #
14795
Year Built
1935
Length
9.1 m (29.9 ft)
Max Span
4 m
Width
4.3 m (14.1 ft)
Lanes
2
Daily Traffic
75
Material
Concrete Continuous
Design
Culvert
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$102,000
Total Project Cost
$153,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.