COUNTY RD 409 over DRY FK CR

S 2 T 40 N R 7 W · County 125, Missouri · Built 1930 · 2 Lanes · 60 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
14498
Year Built
1930
Length
21.3 m (69.9 ft)
Max Span
10.1 m
Width
6.5 m (21.3 ft)
Lanes
2
Daily Traffic
60
Material
Concrete
Design
Tee Beam
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$351,000
Total Project Cost
$527,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.