EDGAR RD S over IS 44 BNSF RR

S 4 T 44 N R 6 E · County 189, Missouri · Built 1969 · 2 Lanes · 5,627 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
1426
Year Built
1969
Reconstructed
1984
Length
109.7 m (359.9 ft)
Max Span
25.6 m
Width
11.5 m (37.7 ft)
Lanes
2
Daily Traffic
5,627
Material
Concrete Continuous
Design
Box Beam or Girders - Single or Spread
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,697,000
Total Project Cost
$2,546,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.