COUNTY RD #425 over CAPTAINS CR

S 24 T 32 N R 5 E · County 123, Missouri · Built 1975 · 1 Lanes · 10 vehicles/day

Overall
Fair
Culvert
6
Satisfactory

Bridge Details

Structure #
14184
Year Built
1975
Length
7.9 m (25.9 ft)
Max Span
1.8 m
Width
3.2 m (10.5 ft)
Lanes
1
Daily Traffic
10
Material
Concrete
Design
Culvert
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$150,000
Total Project Cost
$225,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.