W 27TH ST E over IS 35
S 7 T 49 N R 33 W · County 095, Missouri · Built 1966 · 6 Lanes · 2,094 vehicles/day
Overall
Deck
5
Fair
Superstructure
5
Fair
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 5 | Fair |
| Substructure | 6 | Satisfactory |
Location
39.078578, -94.594631
This bridge is in worse condition than 79.9% of bridges in County 095. The average bridge in Missouri is 0 years old; this one is 60 years old.
Nearby Bridges
IS 35 S over CST W 27TH ST
Built 1966
RP IS35S TO SOUTHW over IS 35 CST W 27TH ST
Built 1966
IS 35 S over CST SUMMIT ST
Built 1966
RP IS35S TO 27TH S over RP SOUTHWEST TRFY TO IS3
Built 1949
PENN VALLEY DR S over RP PENN VALLEY DR N TO I
Built 2005
IS 35 S over CST JARBOE ST
Built 1967
IS 35 N over CST JARBOE ST
Built 1967
27TH ST EXT over PARSONS SUB
Built 1966
PERSHING RD over WASHINGTON AVE
Built 1991
IS 35 N over CST SOUTHWEST BLVD BNSF
Built 1967
Bridge Details
- Structure #
- 1401
- Year Built
- 1966
- Length
- 70.7 m (232 ft)
- Max Span
- 15.4 m
- Width
- 17.8 m (58.4 ft)
- Lanes
- 6
- Daily Traffic
- 2,094
- Material
- Concrete
- Design
- Frame (except frame culverts)
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $3,458,000
- Total Project Cost
- $5,187,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.