COUNTY RD 355 over TURKEY CR

S 16 T 38 N R 21 W · County 085, Missouri · Built 1900 · 2 Lanes · 15 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
5
Fair

Bridge Details

Structure #
13806
Year Built
1900
Length
6.7 m (22 ft)
Max Span
2.1 m
Width
6.1 m (20 ft)
Lanes
2
Daily Traffic
15
Material
Concrete Continuous
Design
Slab
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.