IGLOO ST over E FK CHARITON RVR
S 3 T 60 N R 15 W · County 121, Missouri · Built 1991 · 1 Lanes · 25 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
40.037447, -92.547828
This bridge is in worse condition than 16.2% of bridges in County 121. The average bridge in Missouri is 0 years old; this one is 35 years old.
Nearby Bridges
ARCHER TRAIL over E FK CHARITON RVR
Built 1988
MO 156 E over E FK CHARITON RVR
Built 2016
FLINT TRAIL over E FK CHARITON RVR
Built 1998
HARNES AVE over RICHLAND CR
Built 1997
MO 3 S over RICHLAND CR
Built 1954
FLINT TRAIL over BR OF E FK CHARITO
Built 2007
ARCHER TRAIL over LONG BR
Built 1997
MO 156 E over LONG BR
Built 1987
OKLAHOMA TRAIL over E FK CHARITON RVR
Built 2013
HELIUM ST over RICHLAND CR
Built 2003
Bridge Details
- Structure #
- 13667
- Year Built
- 1991
- Length
- 17.7 m (58.1 ft)
- Max Span
- 17.4 m
- Width
- 5.1 m (16.7 ft)
- Lanes
- 1
- Daily Traffic
- 25
- Material
- Steel
- Design
- Stringer/Multi-beam or Girder
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $206,000
- Total Project Cost
- $309,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.