COUNTY RD 239 over MESSNER CR

S 26 T 59 N R 11 W · County 205, Missouri · Built 1930 · 1 Lanes · 30 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
13598
Year Built
1930
Length
7.9 m (25.9 ft)
Max Span
3.8 m
Width
5.6 m (18.4 ft)
Lanes
1
Daily Traffic
30
Material
Concrete Continuous
Design
Slab
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$116,000
Total Project Cost
$174,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.