FOUNTAIN ST over TRIB OF CHARITON R
S 36 T 60 N R 16 W · County 121, Missouri · Built 1990 · 2 Lanes · 35 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 5 | Fair |
Location
39.966064, -92.629
This bridge is in worse condition than 79% of bridges in County 121. The average bridge in Missouri is 0 years old; this one is 36 years old.
Nearby Bridges
N SANTA FE over UNNAMED CR
Built 1989
FOUNTAIN ST over TRIB TO CHARITON R
Built 1989
RT HH S over HUCKBY CR
Built 1960
RT J E over CHARITON RVR
Built 2011
FESTIVAL AVE over UNNAMED STR
Built 2003
IMPALA ST over BR OF CHARITON RVR
Built 2000
FOUNTAIN ST over CHARITON RVR
Built 1993
EVERGREEN ST over WALNUT CR
Built 2002
MO 3 S over BNSF RR
Built 1967
HILTON AVE over RICHLAND CR
Built 1994
Bridge Details
- Structure #
- 13184
- Year Built
- 1990
- Length
- 21.6 m (70.9 ft)
- Max Span
- 21 m
- Width
- 5.5 m (18 ft)
- Lanes
- 2
- Daily Traffic
- 35
- Material
- Steel
- Design
- Stringer/Multi-beam or Girder
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $247,000
- Total Project Cost
- $370,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.