IS 49 S over CST MECHANIC ST MO 2

S 5 T 44 N R 31 W · County 037, Missouri · Built 1965 · 3 Lanes · 22,096 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
1318
Year Built
1965
Reconstructed
2002
Length
43.3 m (142.1 ft)
Max Span
16.8 m
Width
10.5 m (34.4 ft)
Lanes
3
Daily Traffic
22,096
Material
Concrete Continuous
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$935,000
Total Project Cost
$1,402,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.