COLUMBIA AVE over UP RR
S 2037 T 45 N R 6 E · County 510, Missouri · Built 1913 · 4 Lanes · 4,060 vehicles/day
Structurally Deficient
— One or more key components rated 4 (Poor) or below
Overall
Deck
3
Serious
Superstructure
3
Serious
Substructure
3
Serious
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 3 | Serious |
| Superstructure | 3 | Serious |
| Substructure | 3 | Serious |
Location
38.610856, -90.273842
This bridge is in worse condition than 96.2% of bridges in County 510. The average bridge in Missouri is 0 years old; this one is 113 years old.
Nearby Bridges
SOUTHWEST AVE over UP RR
Built 1961
ARSENAL ST over UP RR
Built 2003
KINGSHIGHWAY BLVD over UP RR
Built 2015
KINGSHIGHWAY BLVD over DAGGETT AVE
Built 2015
EDWARDS ST S over IS 44 IS 44
Built 1972
MACKLIND AVE S over IS 44 IS 44
Built 1969
IS 44 E over CST KINGSHIGHWAY BLVD
Built 2018
IS 44 W over CST KINGSHIGHWAY BLVD
Built 2018
IS 44 W over CST SUBLETTE AVE
Built 1969
IS 44 E over CST SUBLETTE AVE
Built 1969
Bridge Details
- Structure #
- 12879
- Year Built
- 1913
- Length
- 28.9 m (94.8 ft)
- Max Span
- 9.8 m
- Width
- 18.1 m (59.4 ft)
- Lanes
- 4
- Daily Traffic
- 4,060
- Material
- Concrete Continuous
- Design
- Tee Beam
- Owner
- City or Municipal Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $1,250,000
- Total Project Cost
- $1,875,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.