168TH ST over BR OF CAMP CR

S 15 T 53 N R 32 W · County 047, Missouri · Built 1950 · 1 Lanes · 88 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
12804
Year Built
1950
Reconstructed
2014
Length
10.2 m (33.5 ft)
Max Span
9.1 m
Width
6.1 m (20 ft)
Lanes
1
Daily Traffic
88
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$141,000
Total Project Cost
$211,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.