STARLING AIRPORT over BIG MUDDY CR

S 22 T 43 N R 6 E · County 099, Missouri · Built 1997 · 2 Lanes · 9,500 vehicles/day

Overall
Good
Culvert
7
Good

Bridge Details

Structure #
12624
Year Built
1997
Length
8.5 m (27.9 ft)
Max Span
7.6 m
Width
12.7 m (41.7 ft)
Lanes
2
Daily Traffic
9,500
Material
Aluminum, Wrought Iron, or Cast Iron
Design
Culvert
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.