RP 10TH ST TO IS64 over CST SPRUCE ST

S 23 T 45 N R 7 E · County 510, Missouri · Built 1967 · 1 Lanes · 2,657 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
1259
Year Built
1967
Length
303.6 m (996.1 ft)
Max Span
29.3 m
Width
7.4 m (24.3 ft)
Lanes
1
Daily Traffic
2,657
Material
Steel Continuous
Design
Girder and Floorbeam System
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$4,135,000
Total Project Cost
$6,202,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.