MORELOCK CEM RD over BRANCH OF SPRING C

S 33 T 64 N R 17 W · County 001, Missouri · Built 1900 · 1 Lanes · 20 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
12332
Year Built
1900
Length
7.6 m (24.9 ft)
Max Span
7.6 m
Width
5.1 m (16.7 ft)
Lanes
1
Daily Traffic
20
Material
Concrete
Design
Tee Beam
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$170,000
Total Project Cost
$255,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.