COUNTY RD NW 1401 over TRIB CAMPBELL BR

S 5 T 38 N R 28 W · County 185, Missouri · Built 1930 · 2 Lanes · 40 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
12312
Year Built
1930
Reconstructed
1972
Length
9.1 m (29.9 ft)
Max Span
8.8 m
Width
6.2 m (20.3 ft)
Lanes
2
Daily Traffic
40
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$192,000
Total Project Cost
$289,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.