COUNTY RD #108 over DRAIN DTCH
S 29 T 23 N R 9 E · County 069, Missouri · Built 1977 · 1 Lanes · 50 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 6 | Satisfactory |
Location
36.601781, -90.116097
This bridge is in worse condition than 51.2% of bridges in County 069. The average bridge in Missouri is 0 years old; this one is 49 years old.
Nearby Bridges
COUNTY RD 116 over DRAIN DTCH
Built 2020
RT J E over DRAIN DITCH
Built 2024
RT H S over DRAIN DTCH
Built 1952
COUNTY RD 219 over DRAIN DTCH
Built 2007
RT H S over LATERAL DITCH NO 2
Built 2024
COUNTY RD 227 over MAIN DTCH
Built 2012
MO 53 S over MALRIAL DTCH
Built 2018
MO 53 S over DRAIN DTCH NO 12
Built 1971
MO 53 S over DRAIN DTCH NO 2
Built 1939
COUNTY RD #110 over DRAIN DTCH
Built 2003
Bridge Details
- Structure #
- 12299
- Year Built
- 1977
- Reconstructed
- 1985
- Length
- 14.3 m (46.9 ft)
- Max Span
- 6.4 m
- Width
- 5.3 m (17.4 ft)
- Lanes
- 1
- Daily Traffic
- 50
- Material
- Steel
- Design
- Stringer/Multi-beam or Girder
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $174,000
- Total Project Cost
- $260,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.