MO 364 W over MO 141 RP MO364E TO M

S 19 T 46 N R 5 E · County 189, Missouri · Built 2001 · 5 Lanes · 36,086 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
12143
Year Built
2001
Length
92.4 m (303.1 ft)
Max Span
23.5 m
Width
25.3 m (83 ft)
Lanes
5
Daily Traffic
36,086
Material
Prestressed Concrete Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.