MO 84 E over IS 55
S 2 T 18 N R 12 E · County 155, Missouri · Built 1969 · 4 Lanes · 9,530 vehicles/day
Structurally Deficient
— One or more key components rated 4 (Poor) or below
Overall
Deck
6
Satisfactory
Superstructure
4
Poor
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 4 | Poor |
| Substructure | 6 | Satisfactory |
Location
36.231483, -89.731617
This bridge is in worse condition than 93.7% of bridges in County 155. The average bridge in Missouri is 0 years old; this one is 57 years old.
Nearby Bridges
MO 84 E over MAIN DTCH NO 6
Built 1987
IS 55 S over MAIN DTCH NO 6
Built 1969
IS 55 S over CRD 344 ABANDONED RR
Built 1969
IS 55 N over CRD 344 ABANDONED RR
Built 1969
COUNTY RD 344 over DRAIN DTCH
Built 2016
MO 84 E over DRAIN DTCH NO 6
Built 1930
US 412 W over BNSF RR
Built 2001
US 412 E over BNSF RR
Built 2001
IS 55 S over MAIN DTCH NO 6
Built 1969
RP IS55S TO IS155S over IS 155
Built 1974
Bridge Details
- Structure #
- 1213
- Year Built
- 1969
- Reconstructed
- 1984
- Length
- 76.8 m (252 ft)
- Max Span
- 26.5 m
- Width
- 21.5 m (70.5 ft)
- Lanes
- 4
- Daily Traffic
- 9,530
- Material
- Steel Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $1,938,000
- Total Project Cost
- $2,907,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.