MO 5 S over NIANGUA ARM LAKE O

S 28 T 39 N R 17 W · County 029, Missouri · Built 2000 · 2 Lanes · 10,940 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
9
Excellent
Substructure
6
Satisfactory

Bridge Details

Structure #
12059
Year Built
2000
Length
611.1 m (2004.9 ft)
Max Span
61.1 m
Width
13.7 m (44.9 ft)
Lanes
2
Daily Traffic
10,940
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.