MO 8 E over N FK FOURCHE-A-REN

S 24 T 37 N R 1 E · County 221, Missouri · Built 1965 · 2 Lanes · 3,815 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Poor
Deck
4
Poor
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
1194
Year Built
1965
Reconstructed
1986
Length
38.7 m (127 ft)
Max Span
14.6 m
Width
10.5 m (34.4 ft)
Lanes
2
Daily Traffic
3,815
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$747,000
Total Project Cost
$1,121,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.