RT C E over US 54
S 24 T 44 N R 12 W · County 051, Missouri · Built 1965 · 5 Lanes · 18,510 vehicles/day
Structurally Deficient
— One or more key components rated 4 (Poor) or below
Overall
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
4
Poor
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 5 | Fair |
| Substructure | 4 | Poor |
Location
38.553694, -92.197367
This bridge is in worse condition than 90.7% of bridges in County 051. The average bridge in Missouri is 0 years old; this one is 61 years old.
Nearby Bridges
US 54 W over CST STADIUM BLVD
Built 1966
US 54 E over CST STADIUM BLVD
Built 1966
RP MADISON ST TO U over US 54
Built 1966
MO 179 S over US 54
Built 2003
MESA AVE over E BR OF WEARS CR
Built 1960
JEFFERSON ST E over US 54
Built 2007
LESLIE BLVD over E BR OF WEARS CR
Built 1962
W STADIUM BLVD over S BR OF WEARS CR
Built 1981
LORENZO GREENE DR over BR OF MOREAU RIVER
Built 1978
CHRISTY DR over UNNAMED TRIB
Built 2003
Bridge Details
- Structure #
- 1083
- Year Built
- 1965
- Reconstructed
- 1981
- Length
- 62 m (203.4 ft)
- Max Span
- 20.7 m
- Width
- 20.6 m (67.6 ft)
- Lanes
- 5
- Daily Traffic
- 18,510
- Material
- Steel Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $1,894,000
- Total Project Cost
- $2,840,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.