MO 7 S over MURPHY CRK

S 4 T 36 N R 14 W · County 029, Missouri · Built 1964 · 2 Lanes · 2,014 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
1017
Year Built
1964
Reconstructed
1988
Length
46.9 m (153.9 ft)
Max Span
18.3 m
Width
9 m (29.5 ft)
Lanes
2
Daily Traffic
2,014
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$814,000
Total Project Cost
$1,221,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.