US 160 E over FINLEY RVR

S 1 T 26 N R 22 W · County 043, Missouri · Built 1984 · 2 Lanes · 10,480 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
10081
Year Built
1984
Length
229.2 m (752 ft)
Max Span
23 m
Width
14.2 m (46.6 ft)
Lanes
2
Daily Traffic
10,480
Material
Prestressed Concrete Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.