MO 76 E over CLEVER CR

S 1 T 26 N R 14 W · County 067, Missouri · Built 1940 · 2 Lanes · 192 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
10000
Year Built
1940
Length
15.5 m (50.9 ft)
Max Span
3.2 m
Width
7.2 m (23.6 ft)
Lanes
2
Daily Traffic
192
Material
Concrete Continuous
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.