FOWLER ROAD over ELLISON CREEK

SEC 28 T11N R 2E · County 163, Mississippi · Built 2008 · 2 Lanes · 50 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
SA8200000000110
Year Built
2008
Length
43.3 m (142.1 ft)
Max Span
24.4 m
Width
9.5 m (31.2 ft)
Lanes
2
Daily Traffic
50
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$284,000
Total Project Cost
$426,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.