HIGHWAY 3 TINSLEY over PERRY CREEK

SEC 11 T10N R 3W B · County 163, Mississippi · Built 1987 · 2 Lanes · 80 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
SA8200000000059
Year Built
1987
Length
110.3 m (361.9 ft)
Max Span
30.5 m
Width
9.5 m (31.2 ft)
Lanes
2
Daily Traffic
80
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$740,000
Total Project Cost
$1,086,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.