NEPANEE ROAD over SHELL LAKE CUTOFF
SEC 24 T19N R 7W B · County 151, Mississippi · Built 1958 · 2 Lanes · 20 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 6 | Satisfactory |
Location
33.477633, -90.875239
This bridge is in worse condition than 39.7% of bridges in County 151. The average bridge in Mississippi is 0 years old; this one is 68 years old.
Nearby Bridges
BASSI ROAD over BOGUE PHALIA
Built 1966
NEPANEE ROAD over COLD WATER CREEK
Built 2016
BROWN ROAD over CANAL
Built 1984
EXPERIMENT STA RD over CANAL
Built 1975
L & N ROAD over BEAR LAKE
Built 1975
FAS 616 HELM RD over BOGUE PHALIA
Built 2020
NEPANEE ROAD over BEAR LAKE
Built 1965
BASSI ROAD over BEAR LAKE
Built 2021
FAS 616 NEPANEE RD over OLD BOGUE PHALIA
Built 2018
US 61 over BOGUE PHALIA RIVER
Built 1948
Bridge Details
- Structure #
- SA7600000000289
- Year Built
- 1958
- Length
- 48.2 m (158.1 ft)
- Max Span
- 12.2 m
- Width
- 7.5 m (24.6 ft)
- Lanes
- 2
- Daily Traffic
- 20
- Material
- Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $651,000
- Total Project Cost
- $1,251,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.