CR 133 over YELLOW CREEK

SEC 10 T 4S R 9E B · County 141, Mississippi · Built 2021 · 20 Lanes · 150 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
SA710000000A032
Year Built
2021
Length
37 m (121.4 ft)
Max Span
18 m
Width
9 m (29.5 ft)
Lanes
20
Daily Traffic
150
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.