GWIN LIPNICK ROAD over BEAVER DAM BAYOU

SEC 21 T19N R 4W · County 133, Mississippi · Built 2016 · 2 Lanes · 30 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
SA670000000A064
Year Built
2016
Length
46.3 m (151.9 ft)
Max Span
12.2 m
Width
9.3 m (30.5 ft)
Lanes
2
Daily Traffic
30
Material
Concrete
Design
Channel Beam
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$1,151,000
Total Project Cost
$1,401,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.