NORTH BOLIVAR COUN over NATURAL SLOUGH

SEC 19 T22N R 4W · County 133, Mississippi · Built 1975 · 2 Lanes · 50 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Poor
Deck
5
Fair
Superstructure
6
Satisfactory
Substructure
4
Poor

Bridge Details

Structure #
SA6700000000128
Year Built
1975
Length
23.2 m (76.1 ft)
Max Span
5.8 m
Width
8.9 m (29.2 ft)
Lanes
2
Daily Traffic
50
Material
Concrete
Design
Channel Beam
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$406,000
Total Project Cost
$506,000