WALKER ROAD over NATURAL BAYOU
SEC 5 T21N R 4W · County 133, Mississippi · Built 1977 · 2 Lanes · 50 vehicles/day
Structurally Deficient
— One or more key components rated 4 (Poor) or below
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
3
Serious
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 3 | Serious |
Location
33.721239, -90.630308
This bridge is in worse condition than 81.1% of bridges in County 133. The average bridge in Mississippi is 0 years old; this one is 49 years old.
Nearby Bridges
MALLETTE-JONES RD over NATURAL BAYOU
Built 2016
LUSK ROAD over NATURAL BAYOU
Built 2022
DOCKERY-RALPH RAY over SUNFLOWER RIVER
Built 1968
JEFCOAT LEHR ROAD over NATURAL SLOUGH
Built 2019
OLD RULEVILLE ROAD over TRIB OF LEAD CREEK
Built 1975
SR 8 over SUNFLOWER RIVER
Built 2015
SR 8 over SUNFLOWER RIVER
Built 2012
SUNRISE DRIVE over OTTER LAKE
Built 2019
CEMETERY ROAD over DOUGHERTY BAYOU
Built 1977
PEAVINE ROAD over BCH OF LEAD BAYOU
Built 1995
Bridge Details
- Structure #
- SA6700000000108
- Year Built
- 1977
- Length
- 23.2 m (76.1 ft)
- Max Span
- 5.8 m
- Width
- 7.6 m (24.9 ft)
- Lanes
- 2
- Daily Traffic
- 50
- Material
- Concrete
- Design
- Channel Beam
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $350,000
- Total Project Cost
- $450,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.