SMITH CO. 150-A over BCH OF DAVIS CREEK

SEC 3 T 4N R 6E · County 129, Mississippi · Built 1975 · 10 Lanes · 20 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Failed
Deck
0
Failed
Superstructure
0
Failed
Substructure
0
Failed

Bridge Details

Structure #
SA6500000000081
Year Built
1975
Length
11 m (36.1 ft)
Max Span
4 m
Width
5 m (16.4 ft)
Lanes
10
Daily Traffic
20
Material
Wood or Timber
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$500,000
Total Project Cost
$700,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.