FORK CREEK LOOP RD over DRAINAGE CANAL DCDD

SEC 20 T12N R 6W B · County 125, Mississippi · Built 2021 · 2 Lanes · 320 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
SA630000000A016
Year Built
2021
Length
21 m (68.9 ft)
Max Span
9.4 m
Width
9.9 m (32.5 ft)
Lanes
2
Daily Traffic
320
Material
Concrete
Design
Channel Beam
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$326,000
Total Project Cost
$626,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.