SAGO ROAD over DRAINAGE CANAL OBDD
SEC 27 T14N R 7W · County 125, Mississippi · Built 1998 · 2 Lanes · 50 vehicles/day
Overall
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 8 | Very Good |
| Superstructure | 8 | Very Good |
| Substructure | 8 | Very Good |
Location
33.032169, -90.896697
This bridge is in worse condition than 4.9% of bridges in County 125. The average bridge in Mississippi is 0 years old; this one is 28 years old.
Nearby Bridges
SAGO ROAD over CANAL-1001
Built 1993
PANTHER BURN ROAD over DRAINAGE CANAL OBDD
Built 1996
SAGO ROAD over DRAINAGE CANAL OBDD
Built 2021
CAMETA ROAD over MAIN A CANAL
Built 1984
CAMETA ROAD over DRAINAGE CANAL
Built 2005
PETE WOOD ROAD over CANAL
Built 1995
SAGO ROAD over CANAL
Built 2004
CAMETA ROAD over DRAINAGE CANAL
Built 1962
EIFLING ROAD over CANAL
Built 2020
US 61 over DEER CREEK
Built 2012
Bridge Details
- Structure #
- SA6300000000064
- Year Built
- 1998
- Length
- 21 m (68.9 ft)
- Max Span
- 9.4 m
- Width
- 9.9 m (32.5 ft)
- Lanes
- 2
- Daily Traffic
- 50
- Material
- Concrete
- Design
- Channel Beam
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $326,000
- Total Project Cost
- $626,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.