MORTON MARATHON RD over BCH OF ROBINSON CREEK

SEC 18 T 5N R 7E B · County 123, Mississippi · Built 2001 · 2 Lanes · 670 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
SA6200000000018
Year Built
2001
Length
18.9 m (62 ft)
Max Span
9.4 m
Width
7.5 m (24.6 ft)
Lanes
2
Daily Traffic
670
Material
Concrete
Design
Channel Beam
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$220,000
Total Project Cost
$380,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.