FLORENCE-BYRAM RD. over PEARL RIVER RELIEF

SEC 19 T 4N R 1E B · County 121, Mississippi · Built 1988 · 2 Lanes · 7,300 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
SA6100000000051
Year Built
1988
Length
121.9 m (399.9 ft)
Max Span
12.2 m
Width
10.1 m (33.1 ft)
Lanes
2
Daily Traffic
7,300
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$910,000
Total Project Cost
$1,121,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.