WHITE ROAD over STEEN CREEK
SEC 10 T 3N R 1E · County 121, Mississippi · Built 1973 · 2 Lanes · 1,800 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 5 | Fair |
Location
32.1132, -90.189197
This bridge is in worse condition than 82.5% of bridges in County 121. The average bridge in Mississippi is 0 years old; this one is 53 years old.
Nearby Bridges
WHITE ROAD over STEEN CREEK RELIEF
Built 2024
WHITE ROAD over STEEN CREEK RELIEF
Built 2024
FOSTER RD over MOUNTAIN CREEK
Built 1989
WHITE ROAD over FRENCH BRANCH
Built 2010
HICKORY RIDGE RD. over HOLCOMB BRANCH
Built 2023
OLD ENOCHS RD. over BCH OF MOUNTAIN CREEK
Built 1999
BYRD RD over DITCH
Built 1995
MULLICAN ROAD over LAKE RELIEF
Built 1995
OLD ENOCHS RD. over HOMINY CREEK
Built 2006
CLEAR BRANCH RD over BEAR CREEK
Built 2010
Bridge Details
- Structure #
- SA6100000000005
- Year Built
- 1973
- Length
- 54.9 m (180.1 ft)
- Max Span
- 18.3 m
- Width
- 8.8 m (28.9 ft)
- Lanes
- 2
- Daily Traffic
- 1,800
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $364,000
- Total Project Cost
- $452,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.